Home > Searched NO. >

N-Channel StrongIRFET power MOSFET, 75V, 210A, 1.6mOhm, D2PAK-7

Brand:

Package:

D2PAK-7 / TO-263-7 (10.0 x 10.0 mm)

In stock:

8681pcs

Cargo cycle: 3~7 Days
The minimum order is 1

Go to Inquiry
N-Channel HEXFET power MOSFET, 200V, 9A, 0.4 Ohm, TO-220

Brand:

Package:

TO-220AB (15.5 x 10.67 mm, through-hole)

In stock:

6905pcs

Cargo cycle: 3~7 Days
The minimum order is 1

Go to Inquiry
N-Channel HEXFET power MOSFET, 100V, 42A, 36mOhm, TO-247

Brand:

Package:

TO-247 (21.0 x 15.7 mm, through-hole)

In stock:

6601pcs

Cargo cycle: 3~7 Days
The minimum order is 1

Go to Inquiry
600V half-bridge MOSFET/IGBT gate driver, 2A, PDIP-14

Brand:

Package:

PDIP-14 (19.3 x 6.35 mm, through-hole)

In stock:

3226pcs

Cargo cycle: 3~7 Days
The minimum order is 1

Go to Inquiry
P-Channel HEXFET power MOSFET, -30V, -6.7A, 28mOhm, SOIC-8

Brand:

Package:

SOIC-8 (4.9 x 3.9 mm)

In stock:

6783pcs

Cargo cycle: 3~7 Days
The minimum order is 1

Go to Inquiry
N-Channel OptiMOS power MOSFET, 30V, 90A, 2.5mOhm, DPAK

Brand:

Package:

DPAK / TO-252-3 (6.73 x 6.22 mm)

In stock:

4732pcs

Cargo cycle: 3~7 Days
The minimum order is 1

Go to Inquiry
1200V 150A IGBT half-bridge module, 62mm industry standard package

Brand:

Package:

62mm module (122.0 x 62.0 x 37.0 mm, screw terminals)

In stock:

9500pcs

Cargo cycle: 3~7 Days
The minimum order is 1

Go to Inquiry
N-Channel OptiMOS power MOSFET, 100V, 200A, 2mOhm, TO-247

Brand:

Package:

TO-247-3 (21.0 x 15.7 mm, through-hole)

In stock:

11344pcs

Cargo cycle: 3~7 Days
The minimum order is 1

Go to Inquiry
Schottky rectifier diode, 10V, 3A, very low forward voltage, SOD-323

Brand:

Package:

SOD-323 (2.5 x 1.25 x 0.95 mm)

In stock:

2916pcs

Cargo cycle: 3~7 Days
The minimum order is 1

Go to Inquiry
Transition-mode power factor corrector, DIP-8

Brand:

Package:

DIP-8 (9.81 x 6.35 mm, through-hole)

In stock:

5756pcs

Cargo cycle: 3~7 Days
The minimum order is 1

Go to Inquiry

Online Inquiry Form

Support Excel, PDF, CSV format files for full BOM list quotation

Submit your component procurement and custom packaging needs via the form below. We will provide a detailed quotation and professional solution within 1–8 working hours.