Home > Searched NO. >

5x20mm SMD time-lag glass fuse, 250VAC, 35A breaking capacity, gold-plated terminals, -55 to 125°C

Brand:

Package:

SMD 5x20mm glass tube with gold-plated terminals
In stock:
5240pcs

Cargo cycle: 3~7 Days
The minimum order is 1

Go to Inquiry
Schurter subminiature fuse, 250VAC, PCB mount, quick-acting/time-lag options

Brand:

Package:

PCB THT/SMD (5×20mm or subminiature)
In stock:
6738pcs

Cargo cycle: 3~7 Days
The minimum order is 1

Go to Inquiry
Schurter PFTL series resettable PPTC SMD fuse, 6-60 VDC, 0.05-5A hold current

Brand:

Package:

SMD (0603–2920 footprint)
In stock:
7241pcs

Cargo cycle: 3~7 Days
The minimum order is 1

Go to Inquiry
IEC Power Inlet Filter with fuse holder, 250VAC, EMC line filter, Schurter

Brand:

Package:

Chassis Mount (panel cutout per IEC 60320)
In stock:
2800pcs

Cargo cycle: 3~7 Days
The minimum order is 1

Go to Inquiry
SMD super-time-lag (TT) fuse, 125VAC/125VDC, 5.3x16mm ceramic

Brand:

Package:

5.3 x 16 mm SMD ceramic
In stock:
6847pcs

Cargo cycle: 3~7 Days
The minimum order is 1

Go to Inquiry
Subminiature Time-Lag Fuse, 250VAC, high breaking capacity, IEC 60127, Schurter

Brand:

Package:

Subminiature (5x20mm or equivalent)
In stock:
3200pcs

Cargo cycle: 3~7 Days
The minimum order is 1

Go to Inquiry
Time-lag (T) miniature fuse, 250VAC, 6.3x32mm, SPT series

Brand:

Package:

6.3 x 32 mm cartridge (glass tube, sand-filled)
In stock:
5274pcs

Cargo cycle: 3~7 Days
The minimum order is 1

Go to Inquiry
Schurter circuit protection component, internal part number

Brand:

Package:

Per Schurter catalog specification
In stock:
3021pcs

Cargo cycle: 3~7 Days
The minimum order is 1

Go to Inquiry
SMD fuse FF type, MGA-A series, 1206 ceramic, 300A breaking, Schurter

Brand:

Package:

1206 ceramic (3.2 x 1.6 x 1.0mm)
In stock:
14905pcs

Cargo cycle: 3~7 Days
The minimum order is 1

Go to Inquiry
35mA SMD fuse, 63VDC, FF super-quick, 0603, glass body, Schurter USL series

Brand:

Package:

0603 (1.6 x 0.8 x 0.53mm)
In stock:
13709pcs

Cargo cycle: 3~7 Days
The minimum order is 1

Go to Inquiry

Online Inquiry Form

Support Excel, PDF, CSV format files for full BOM list quotation

Submit your component procurement and custom packaging needs via the form below. We will provide a detailed quotation and professional solution within 1–8 working hours.